Sunday, March 18, 2012

Emirates A380-800 EK306 arrival Beijing 18 March 2012 14H45.
Běijīng Shǒudū Guójì Jīchǎng-Terminal 3 was designed by a consortium of NACO (Netherlands Airport Consultants B.V), UK Architect Foster and Partners and ARUP. Lighting was designed by UK lighting architects Speirs and Major Associates. The budget of the expansion is US$3.5 billion. Far grander in size and scale than the preexisting terminals, Terminal 3 was the largest airport terminal-building complex in the world to be built in a single phase with 986,000 m2 (10,610,000 sq ft) in total floor area at its opening.

No comments:

Post a Comment